Ultra Long Duration Energy Storage: Project Development Studies
GrantActiveDelivered by Innovate UK under the UKRI R&D Missions Accelerator Programme, this competition funds project development studies that prepare ultra-long-duration battery energy storage demonstrators, covering technology assessment, engineering design, cost roadmaps, market analysis and development and manufacturing plans for electrochemical systems capable of 100 hour or longer discharge and a 25-year lifespan. Grants run between GBP 350K and GBP 700K per project from a GBP 3M pot, for studies lasting three to nine months. The lead applicant must be a UK registered business of any size; academic institutions cannot lead or work alone, and collaboration with UK or international partners is permitted but not required. Applicants must show their technology fits either the near-commercial or the early-stage stream; the single closed-window competition opened 3 August 2026 and closes 30 September 2026.
Founder Intel
Sign in to read intel from founders who have worked with Ultra Long Duration Energy Storage: Project Development Studies.
What founders say about Ultra Long Duration Energy Storage: Project Development Studies
Be the first to share intel on Ultra Long Duration Energy Storage: Project Development Studies — it's free.
Get Started FreeRelated on The List
- NSF SBIR/STTR (America's Seed Fund) — Grant · USA
- CalSEED — Grant · CA, USA
- DOE SBIR Program — Grant · USA
- IGNIITE 2026 — Grant · USA
- NYSERDA Cleantech Funding — Grant · USA
Comparing options? Founders discuss fundraising in the forum, or browse the rest of The List.