Ultra Long Duration Energy Storage: Project Development Studies

GrantActive
Type: Federal GrantAmount: £350K-£700KApplications: OpenDeadline: 2026-09-30Location: United KingdomWebsiteApply

Delivered by Innovate UK under the UKRI R&D Missions Accelerator Programme, this competition funds project development studies that prepare ultra-long-duration battery energy storage demonstrators, covering technology assessment, engineering design, cost roadmaps, market analysis and development and manufacturing plans for electrochemical systems capable of 100 hour or longer discharge and a 25-year lifespan. Grants run between GBP 350K and GBP 700K per project from a GBP 3M pot, for studies lasting three to nine months. The lead applicant must be a UK registered business of any size; academic institutions cannot lead or work alone, and collaboration with UK or international partners is permitted but not required. Applicants must show their technology fits either the near-commercial or the early-stage stream; the single closed-window competition opened 3 August 2026 and closes 30 September 2026.

Energy StorageElectricity and GridClean Energy GenerationInfrastructure

Founder Intel

Sign in to read intel from founders who have worked with Ultra Long Duration Energy Storage: Project Development Studies.

What founders say about Ultra Long Duration Energy Storage: Project Development Studies

Be the first to share intel on Ultra Long Duration Energy Storage: Project Development Studies — it's free.

Get Started Free